CONTRACT AWARD ADVERT FOR THE REHABILITATION/CONSTRUCTION OF 19NOS RIVER CROSSING IN ADAMAWA STATE

 

Bidding was conducted through national competitive procedures as specified in the World Bank guidelines: Procurement of goods, works and non-consulting services under IBRD Loans and IDA Credits and grands by World Bank borrowers revised January, 2011, revised July, 1, 2014 (“Procurement guidelines”) and was opened to all eligible bidders as defined in the procurement guidelines.

BID NO: ADRAMP-2/WKS/NCB/1/4/2017

Name of project: Adamawa State Second Rural Access and Mobility Project (RAMP-2)

Project Number: PO95003

IDA CREDIT No/AFD No – 51540- NG/CNG101101F

Name: Construction/Rehabilitation of 19Nos. River Crossing in Adamawa state

Duration of Contract: 12 Months

Evaluation Currency: Naira

Firms that Bided and amount

S/N

NAMES/ADDRESS OF FIRMS

READ OUT BID PRICE

LOTS

Currency(ies)

Amount(s)

1

ABILELE INDUSTRIES LTD

NAIRA

164,226,032.39

1

2

G & G CONSTRUCTION

NAIRA

524,843,164.76

2

3

SKYVIEW INTEGRATED MULTI CONCEPT LTD

NAIRA

253,253,001.65

2

4

ELEGANCE CONSTRUCTION COMP.LTD

NAIRA

379,848,728.40

4

5

GRACELAND GLOBAL LEGENTS LTD.

NAIRA

141,365,654.64

3

6

ELEGANCE CONSTRUCTION COMP. LTD

NAIRA

305,069,677.00

3

7

GONGOLA GLOBAL NIG. LTD

NAIRA

377,471,467.17

5

8

DUTUM COMPANY LIMITED

NAIRA

312,633,591.10

5

9

BOZEAL LTD

NAIRA

221,167,850.14

1

10

THINK ENGINEERING LTD

NAIRA

476,801,667.72

2

11

KIPS ENGINEERING LTD.

NAIRA

497,090,650.20

4

12

KARPHY ENGINEERING LIMITED

NAIRA

304,631,755.20

4

13

A.D. ABBA MARWA NIG. LTD

NAIRA

213,001,424.00

1

14

TONI MARSHAL WORLD WIDE LTD.

NAIRA

317,277,510.64

3

15

HIMMAD NIG. LTD

NAIRA

233,540,417.50

3

16

STABLE TECHNOLOGY LTD

NAIRA

371,362,340.48

4

17

LEE FAKINO ENG. LTD

NAIRA

268,957,803.64

4

18

PROPORTION CONSTRUCTION & DREDGE WORK NIG. LTD

NAIRA

494,629,765.25

2

19

MUSA KWAYA ENTERPRISE LTD.

NAIRA

283,543,611.12

3

20

NAEL BIN HARMAR HYDRO EXPORT LTD

NAIRA

245,422,877.96

3

21

ELEGANCE CONST. COMP. LTD

NAIRA

381,238,555.40

5

22

AMAL ENGINEERING COMP.

NAIRA

245,828,019.20

3

23

PRACTICAL ACTION LTD

NAIRA

269,686,003.39

3

24

ELEGANCE CONST. COMPANY LTD

NAIRA

545,217,256.70

2

25

BOZEAL NIGERIA LTD.

NAIRA

238,667,700.60

3

26

ELEGANCE CONST. COMP. LTD

 

304,917,146.10

1

27

THOMAS CASE LTD

NAIRA

293,503,395.12

3

28

THOMAS CASE LTD

NAIRA

298,202,381.46

1

29

THOMAS CASE LTD

NAIRA

661,148,584.40

2

Non Responsive Bidders and Reason for Non Responsiveness

LOT

S/N

NAMES OF FIRMS

BID PRICE AS READ OUT

(N)

REMARKS

1

1

ABILELE INDUSTRIES LTD

N164,226,032.39

Bid security Scan copy submitted as against ITT 30.1

2

2

G & G CONSTRUCTION

N524,843,164.76

Bid security Scan copy submitted as against ITT 30.1

3

SKYVIEW INTEGRATED MULTI CONCEPT LTD

N253,253,001.65

Letter of bid not in conformity with ITT 20.1 and section 5 form W-1 of the bidding document

No Power of Attorney as against ITT 19 sub clause e of the bidding document

No evidence of ownership or lease of equipment ITT 14.1

4

THINK ENGINEERING LTD

N476,801,667.72

Bid security Scan copy submitted as against ITT 30.1

5

PROPORTION CONSTRUCTION & DREDGE WORK NIG. LTD

N494,629,765.25

Bid security Scan copy submitted as against ITT 30.1

3

6

GRACELAND GLOBAL LEGENTS LTD.

N141,365,654.64

Letter of bid not in conformity with ITT 20.1 and section 5 form W-1 of the bidding document

No Power of Attorney as against ITT 19 sub clause e of the bidding document

7

TONI MARSHAL WORLD WIDE LTD.

N317,277,510.64

Bid security Scan copy submitted as against ITT 30.1

8

MUSA KWAYA ENTERPRISE LTD.

N283,543,611.12

Letter of bid not in conformity with ITT 20.1 and section 5 form W-1 of the bidding document

Bid security Scan copy submitted as against ITT 30.1

.9

AMAL ENGINEERING COMP

N245,828,019.20

Bid security Scan copy submitted as against ITT 30.1

10

STABLE TECHNOLOGY LTD

N371,362,340.48

Bid security Scan copy submitted as against ITT 30.1

4

11

Kips Engineering Ltd

N497,090,650.72

No Bid security submitted as against ITT 30.1

 

 Responsive Bidders after Preliminary Examination

 

LOT

S/N

NAMES OF FIRMS

BID PRICE AS READ OUT

(N)

EVALAUTED BID PRICE

RANKING

REMARKS

 

LOT 1

 

1

A.D. ABBA MARWA NIG. LTD

213,001,424.00

214,164,524.00

1st

Recommended being the lowest most responsive bid having met all the requirements of the biddingdocuments.

2

BOZEAL LTD

221,167,850.14

221,167,850.14

2nd

Evaluated Bid price higher than the lowest responsive bid

3

ELEGANCE CONST. COMP. LTD

304,917,146.10

304,917,146.10

3rd

Evaluated Bid price higher than the lowest responsive bid

4

THOMAS

CHASE LTD

298,202,381.46

310,969,320.65

4th

Evaluated Bid price higher than the lowest responsive bid

 

LOT 2

1

ELEGANCE CONST. COMPANY LTD

545,217,256.70

565,781,230.82

1st

Recommended being the lowest most responsive bid having met all the requirements of the bidding documents.

2

THOMAS CHASE LTD

661,148,584.40

643,304,646.61

2nd

Evaluated Bid price higher than the lowest responsive bid

 

 

 

LOT 3

 

1

BOZEAL NIGERIA LTD.

238,667,700.60

228,855,450.60

1st

Not recommended because the firm has

No financial capability for the assignment, Clear example is the firm has an ongoing project for the past two (2) years with ADRAMP and progress made is less than 50% due to lack of capacity in the area of machines, equipment’s and staff.

 

2

HIMMAD NIG. LTD

233,540,417.50

233,540,417.50

2nd

Disqualified: The led firms have only 8years of incorporation as against the 10 years requirement. The firm has no record of past experience in the construction of roads and bridges.

3

NAEL BIN HARMAR HYDRO EXPORT LTD

245,422,877.96

245,422,877.96

3rd

Recommended being the lowest most responsive bid having met all the requirements of the bidding documents.

4

PRACTICAL ACTION LTD

269,686,003.39

269,652,928.39

4th

Evaluated Bid price higher than the lowest responsive bid.

 

5

THOMAS CHASE LTD

293,503,395.12

312,280,011.87

5th

Evaluated Bid price higher than the lowest responsive bid

6

ELEGANCE CONST. COMPANY LTD

305,069,677.00

325,911,304.00

6th

Evaluated Bid price higher than the lowest responsive bid

 

LOT 4

1

LEE FAKINO ENG. LTD

268,957,803.64

268,957,803.64

1st

Recommended being the lowest most responsive bid having met all the requirements of the bidding documents.

2

KARPHY ENGINEERING LIMITED

304,631,755.20

304,631,755.20

2nd

Evaluated Bid price higher than the lowest responsive bid

3

ELEGANCE CONST. COMPANY LTD

379,848,728.40

400,412,680.20

3rd

Evaluated Bid price higher than the lowest responsive bid

 

LOT 5

1

DUTUM COMPANY LIMITED

312,633,591.10

316,200,525.40

1st

Recommended being the lowest most responsive bid having met all the requirements of the bidding documents.

2

GONGOLA GLOBAL NIG. LTD

377,471,467.17

377,454,587.87

2nd

Evaluated Bid price higher than the lowest responsive bid

3

ELEGANCE CONST. COMP. LTD

381,238,555.40

382,007,379.29

3rd

Evaluated Bid price higher than the lowest responsive bid

 

 

Recommended Bidders

LOT

Selection Method

Name of Contract

Recommended Bidder

Bid price at Bid Opening (N)

Final Bid Price

   (N)

1

NCB

Kenye four cell box culvert 4(3mx3.5m), Wuro Hausa triple cell boxculvert 3(3m x 3.5m), Mbulirga triple cell box culvert 3(3m x 3.5m) &Wuro Gude Single cell (2.5m x 2.5m).

 

A.D ABBA MARWA NIG. LTD

 

 

N213,001,424.00

 

N214,164,524.00

 

2

NCB

Dilwachira triple cell box culvert 3(3m x 3.5m), Kwalita Six cell box culvert 6(3m x 3.5m), Pella double cell box 2(3m x 3.5m), Song - Bolki triple cell box culvert 3(3m x 3.5m) & Dumne -Dirma Bridge (1 Span @15m).

 

ELEGANCE CONSTRUCTION LTD

 

N545,217,256.70

 

N565,781,230.82

3

NCB

Shima double cell box culvert 2(3m x 3.5m), Kalambare - Asabe triple cell box culvert 3(3m x 3.5m), Boshikiri -Dumna triple cell box culvert 3(3m x 3.5m) & Guyuk -Duku Thimswabramse double cell box culvert 2(3m x 3.5m)

 

NAEL BIN HARMAR HYDRO EXPORTS LTD

 

 

N245,422,877.96

 

 

 

N245,422,877.96

 

4

NCB

Parda Alajiri -Beti Bridge (1 Span @15m), Diyam Dadi triple cell box 3(3m x 3.5m) & Jada Farang triple cell box culvert 3(3m x 3.5m)

 

LEE FAKINO NIG. LTD

 

N268,957,803.00

 

 

N268,957,803.64

 

5

NCB

Sambang -Jangani triple cell box culvert 3(3m x 3.5m), Buwangal & Gandona triple cell box culvert 3(3m x 3.5m) &Yerima (Mayo-Kome) Bridge       (1 Span @15m)

 

DUTUM COMPANY LIMITED

 

N312,633,591.10

 

N316,200,525.40

SIGNED: State Project Coordinator,

State Project Implementation Unit,

Adamawa State Rural Access and Mobility Project-2 (AD-RAMP2),

Ministry of Rural Infrastructure and Community Development

34, Sir Kashim Ibrahim Way, J/Yola

Adamawa State, Nigeria

Tel.: 08036221691, 09085807573

Email:This email address is being protected from spambots. You need JavaScript enabled to view it.